ZHUANG Liangdong

Position:Assistant Professor
Address:Room 523, New Civil Engineering Building, Tsinghua University, Haidian District, Beijing, China
Postal Code:100084
Tel:(8610) 18811351491
E-mail:zhuangld12@126.com

Education Background

August 1, 2016 – July 1, 2021  Tsinghua University Department of Civil Engineering Ph.D.

August 1, 2012 – July 1, 2016     Tsinghua University   Department of Civil Engineering Bachelor's Degree

Work Experience

December 1, 2023 – Present   Tsinghua University  Assistant Professor

July 1, 2021 – December 1, 2023 Tsinghua University  Postdoctoral Assistant Researcher

Teaching Courses

Concrete Structure (1)

Honors and Awards

January 9, 2025    Second Prize, CRCC Science and Technology Award                                8th

January 9, 2024    First Prize, China Highway & Transportation Society S&T Award                        8th

October 1, 2023   First Prize, China Steel Structure Association S&T Progress Award                      4th

May 1, 2023         First Prize, China Communications and Transportation Association S&T Award 15th

April 25, 2023    First Prize, China Urban Rail Transit S&T Progress Award                              6th

April 25, 2022    Urban Rail Transit S&T Progress Award                                       6th

June 8, 2021   Tsinghua University Shuimu Scholar

Research Interests

Steel-Concrete Composite Structures

Seismic Resistance and Disaster Mitigation of Engineering Structures

Professional Service

January 1, 2024 – Present Guest Editor, Buildings

April 1, 2024 – March 1, 2026 Young Editor, Smart Construction

Research Projects

1. National Key Research and Development Program    Research and Demonstration of Multi-Level In-Service Evaluation Techniques for Large-Scale Prestressed Engineering Structures Throughout Their Entire Lifespan  March 3, 2023 – Present

2. National Natural Science Foundation of China    Study on Mechanical Behavior and Design Method of Novel Y-Eccentrically Braced Composite Frame    January 1, 2023 – December 31, 2024

3. China Postdoctoral Science Foundation Project    Study on Mechanical Behavior and Design Method of Y-Eccentrically Braced Composite Frame  July 22, 2022 – December 13, 2023

Representative Academic Achievements

Academic Paper:

1.Zhuang, Liangdong,Wang,et al. Experimental study on the cyclic behaviour of shear links made of BLY160 steel.[J]. Thin-Walled Structures,2022,Vol.174: 109072.

2.Zhuang, Liangdong,Wang,et al. Experimental study on seismic behaviour of eccentrically braced composite frame with vertical LYP steel shear link.[J]. Engineering Structures,2022,Vol.255: 113957.

3.Liang-Dong Zhuang,Yue Yang,and Yi-Fan Li. Development and Experimental Study of a New Rotational Metallic Damper for the Beam–Column Connection[J]. Journal of Structural Engineering,2022,Vol.148(9): 1-20.

4.Liang-Dong Zhuang,Ji-Zhi Zhao,Chen WangCA1,et al. Experimental study on the composite reinforcement method for single-column piers in existing bridges[J]. Structures,2024,Vol.65: 106734.

5.Liang-Dong Zhuang,Mu-Xuan Tao,Ji-Zhi ZhaoCA1,et al. Experimental and numerical investigations on the mechanical behaviour of large-span circular steel-concrete composite slabs for wind power tower[J]. Thin-Walled Structures,2024,Vol.202: 112107.

6.Zhuang, Liang‐Dong (AUTHOR),Nie,et al. Seismic behavior of highly irregular structures with multiple passive energy dissipation system: Case study of a single‐column elevated station.[J]. Structural Design of Tall & Special Buildings,2020,Vol.29(5): 1-21.

7.Liang-Dong Zhuang,Ji-Zhi Zhao. Numerical Study on the Seismic Behavior of Eccentrically Braced Composite Frames with a Vertical Low-Yield-Point Steel Shear Link[J]. Buildings,2022,Vol.12(9): 1359.

8.Liang-Dong Zhuang,Hong-Bing Chen,Yuan Ma,et al. Research on Whole-Process Tensile Behavior of Headed Studs in Steel–Concrete Composite Structures[J]. International Journal of Concrete Structures and Materials,2021,Vol.15(1): 1-25.

9.Zhao, Ji-Zhi,Tao,et al. Experimental and numerical study on bent shear panel damper made of BLY160 steel.[J]. Engineering Structures,2022,Vol.260: 114229.

10.Zhao, Ji-Zhi,Tao,et al. Development of bent shear panel dampers for eccentrically braced composite frames.[J]. Journal of Constructional Steel Research,2022,Vol.193: 107292.

11.Ji-Zhi Zhao,Mu-Xuan Tao,Liang-Dong ZhuangCA1,et al. Experimental and analytical study on the mechanical properties of U-shaped steel-encased composite beams[J]. Structures,2023,Vol.49: 593-604.

12.Ming Zheng, Liangdong Zhuang, Jiansheng Fan,et al. Field test study on the evaluation of the microvibration controlling capacity of a mass concrete layer[J]. Scientific reports,2022,Vol.1(1): 20245.

13.Kong, Siyu,Zhuang,et al. Load distribution factor for moment of composite bridges with multi-box girders.[J]. Engineering Structures,2020,Vol.215: 110716.

14.Xiao, Jing-Lin,Yang,et al. A numerical and theoretical analysis of the structural performance for a new type of steel-concrete composite aqueduct.[J]. Engineering Structures,2021,Vol.245: 112839.

15.Jiulin Li,Liangdong Zhuang,Zhenguo Liu,et al. Evaluation of cracking in the shrinkage-compensating concrete with freeze–thaw resistance: from materials to structures[J]. Materials and Structures,2022,Vol.55(5): 1-14.

16.Xin Nie,Linli DuanCA1,Liangdong Zhuang,et al. Experimental and numerical study on steel-concrete composite frames with engineered cementitious composites[J]. Engineering Structures,2022,Vol.265: 114489.

17.Ji-Zhi Zhao,Ran Ding,Mu-Xuan TaoCA1,et al. Experimental and numerical research of ultrahigh performance concrete layered shell element based on a two-dimensional fixed crack model[J]. Structures,2022,Vol.46: 598-610.

18.Duan, Linli,Nie,et al. Research on Application of Uplift-Restricted Slip-Permitted (URSP) Connectors in Steel-Concrete Composite Frames[J]. APPLIED SCIENCES-BASEL,2019,Vol.9(11): 2235.

19.ZHUANG Liangdong, NIE Xin, HUANG Da, NIE Jianguo. Experimental study on mechanical performance of shear links with bent steel web panels[J]. Journal of Building Structures,2021,42: 175-184.

20.ZHUANG Liang-dong, YANG Yue, WU Zhen-hao. The Application Of Genetic Algorithm In Seismic Performance Optimization Of Y-Shape Eccentrically Braced Composite Frame[J]. Engineering Mechanics,2023,40(7): 185-195.

21.ZHUANG Liangdong, CHEN Wei, NIE Xin, DUAN Linli, TAO Muxuan, NIE Jianguo. Application of uplift-restricted and slip-permitted connectors in steel-concrete composite frame structures[J]. Journal of Building Structures,2020,41(1): 104-112.

22.WU Zhen-hao, ZHUANG Liang-dong, HUANG Yuan. Experimental Study On Mechanical Property Of Y-Eccentrically Braced Composite Frame With Replaceable Link[J]. Engineering Mechanics,2024,41(3): 173-186.

23.WU Zhen-hao, ZHUANG Liang-dong, HUANG Yuan. Development and application of a new restoring force model for metallic dampers[J]. China Civil Engineering Journal,2023,56(7): 45-54.

24.NIE Xin, XUE Zhi-chao, ZHUANG Liang-dong, SHANG Zhi-qiang, WANG Hong-bo. Research on Anti-Cracking Techniques for Deck in Negative Bending Moment Zone of Long Span Continuous Steel-Concrete Composite Girder Bridge [J]. Bridge Construction,2022,52(4): 24-31.

25.NIE Jianguo, JIANG Yuexin, NIE Xin, ZHUANG Liangdong. Effect of truss reinforcement on mechanical properties of prefabricated slabs[J]. Journal of Building Structures,2021,42: 151-158.

26.ZHANG Tianye, LONG Guanxu, ZHUANG Liangdong, ZHU Shichao, YANG Yaohui. UHPC Steel Fiber Distribution Detection and Finite ElementSimulation of Bending Performance[C]. 2022 Academic Exchange Conference on Industrial Architecture,2022-10-14.

27.Li Yifan, Wang Yulun,Zhao Jizhi 1,2 Zhuang Liangdong1,2 Wu Zhenhao1,2 Theoretical study on seismic behaviour of eccentrically braced composite frame with vertical shear link[J]. ,2024,57(1): 56-64.

28.XU Liyan, NIE Xin, ZHUANG Liangdong, TAO Muxuan. Seismic performance of composite single-column elevated station with hybrid energy dissipation technique[J]. Journal of Building Structures, 2019,40(5): 50-62.

29.Ming Zheng, Liangdong Zhuang, Jiansheng Fan,et al. Field test study on the evaluation of the microvibration controlling capacity of a mass concrete layer[J]. Scientific reports,2022,Vol.1(1): 20245.

30.Xiao-guang Zhang,Ke-yang Yang,Qing-mao Hu,et al. Study of U-shape steel-encased composite beams with variable sections under negative bending moments[J]. Structures,2023,Vol.57: 105098.

31.Yi-Fan Li,Liang-Dong Zhuang,Zhen-Hao Wu. Seismic Assessment of a Single-Column Elevated Station Structure[J]. Buildings,2023,Vol.13(7): 1827.

32.WANG Chunsen, LI Ruisong, XING Min, ZHUANG Liangdong, NIE Xin, ZOU Yan. Seismic Performance Analysis of Steel-Concrete Composite Structural System for Rail Transit Co-Construction Projects[J]. Industrial Construction,2024,54(1): 96-101.

33.ZHU Jing-wei, ZHANG Yu-hang, XIN Gong-feng, ZHUANG Liang-dong' ZHANG Ze-jun, WANG Peng-fei. Experimental Study On Flexural Behavior Of Steel Box Composite Girders With Different Degrees Of Shear Connection[J]. Engineering Mechanics,2024,(200).

34.NIE Xin,ZHOU Xin-yi,ZHUANG Liang-dong. Finite element analysis of mechanical behavior and calculation of bearing capacities for concrete composite slab with rabbets[J]. Journal of Building Structures,2024,45(4): 216-225.

35.WANG Yulun, ZHANG Zejun, ZHUANG Liangdong, XUE Zhichao. ZHANG Wenliang. Load Test of Bridge with Multiple Steel Box Girders and Composite DeckSlabs After Completion and Parametric Analysis[J]. Bridge Construction,2023,53(5): 90-96.


Invention Patents:

1.Nie Jianguo, Zhuang Liangdong, "Rigid Frame Bridge Structure and Construction Method," Patent No.: ZL201910593667.X, Authorization No.: CN110409279B, Applied on July 3, 2019, Authorized on November 12, 2024.

2.Nie Jianguo, Tao Muxuan, Zhao Jizhi, Zhuang Liangdong, "Anti-Tilting Composite Bridge and Construction Method," Patent No.: ZL 202010108145.9, Authorization No.: CN111910500B, Applied on February 21, 2020, Authorized on September 27, 2024.

3.Nie Jianguo, Zhao Jizhi, Zhuang Liangdong, "Composite Pier Beam and Bridge Using It," Patent No.: ZL 202110183046.1, Authorization No.: CN112746554B, Applied on February 8, 2021, Authorized on September 10, 2024.

4.Nie Jianguo, Zhuang Liangdong, "Auxiliary Equipment for Steel Box Girder Suspended Splicing Construction," Patent No.: ZL201811125684.2, Authorization No.: CN108951433B, Applied on September 26, 2018, Authorized on August 30, 2024.

5.Nie Jianguo, Zhuang Liangdong, "Unidirectional Slidable Shear Connector and Construction Method," Patent No.: ZL201910593666.5, Authorization No.: CN110409288B, Applied on July 3, 2019, Authorized on August 13, 2024.

6.Nie Xin, Zhuang Liangdong, Zhong Xunyang, "Structure and Construction Method for Concrete Bridge Widening and Reinforcement," Patent No.: ZL202210364015.0, Authorization No.: CN114775461B, Applied on April 7, 2022, Authorized on July 9, 2024.

7.Nie Jianguo, Zhuang Liangdong, "Anti-Cracking Construction Equipment for Negative Bending Moment Zone of Continuous Composite Beam Bridges, Construction Method, and Beam Bridge," Patent No.: ZL201910640837.5, Authorization No.: CN110409305B, Applied on July 16, 2019, Authorized on April 30, 2024.

8.Nie Jianguo, Zhuang Liangdong, "Anti-Cracking Structure for Continuous Parts of Simply Supported Composite Beam Bridge Supports and Decks," Patent No.: ZL201811124359.4, Authorization No.: CN108951419B, Applied on September 26, 2018, Authorized on April 26, 2024.

9.Xu Liyan, Nie Jianguo, Zhuang Liangdong, "Damping and Seismic Structure for Elevated Single-Pillar Stations," Patent No.: ZL201811125247.0, Authorization No.: CN108952290B, Applied on September 26, 2018, Authorized on March 22, 2024.

10.Nie Jianguo, Zhuang Liangdong, Wang Yong, Zhao Weirong, Ren Zhenguo, "Upper Flange Penetrating #Column Internal Inserted Composite Frame Structure Connection Node, Composite Frame," Patent No.: ZL201710161044.6, Authorization No.: CN106884478B, Applied on March 17, 2017, Authorized on October 25, 2022.

11.Wang Yong, Zhao Weirong, Ren Zhenguo, Nie Jianguo, Zhuang Liangdong, "A High-Speed Railway Elevated Station," Patent No.: ZL201710235612.2, Authorization No.: CN106988423B, Applied on April 12, 2017, Authorized on August 30, 2022.

12.Nie Jianguo, Zhuang Liangdong, "Supporting Equipment and Construction Method for Cross-Line Bridge Pushing Construction," Patent No.: ZL201810014957.X, Authorization No.: CN108221709B, Applied on January 8, 2018, Authorized on October 29, 2019.


Technical Standards:

1.Main Drafter of " Application Technical Standard of Concrete Composite Slab With Rabbets" (T/CECS 1563-2024).

2.Main Drafter of "Hunan Provincial Application Technical Standard for Concrete Composite Slab With Rabbets" (DBJ 43/T 388-2022).

3. Member of the Compilation Group for "Shenzhen Standard Drawing Collection for Composite Floor Slab" (SJT 04-2023).